2nd SCOM Meeting
At the second meeting of the Steering Committee, the contract with the ATG Giurgiu Shipyard was signed, for the provision of dredging equipment, which will contain the following: a dredge, two split-barges, a technical assistance vessel and a pontoon for the installation to load the split-barges.